SEMENISHIN / ENGINEERING SERVICE

Mathematical modeling

Investigate pressure, flow, temperature and process dynamics within an agreed scope.

Request a preliminary engineering assessment

Example problems

Typical problem formulations, not completed projects.

  • Pressure and flow in a selected hydraulic system
  • Temperature regimes and heat loads
  • Process dynamics, parameters and initial conditions
Tₕ,in · ṁₕTₕ,outT_c,outT_c,in · ṁ_cHeat transfer
Two streams: hot h and cold c; T: temperature, ṁ: mass flow.Conceptual schematic, not an equipment design or measured results.

Required inputs

  • Layout, lengths, diameters, elevations and resistance characteristics
  • Fluid properties, inlet temperatures and flows; boundary and initial conditions
  • Heat-transfer or equipment characteristics, measurements and their uncertainty

Possible methods

Methods are selected after reviewing the problem, data and accuracy requirements.

  • Balance equations and differential equations
  • Numerical solution, parameter identification and sensitivity analysis
  • Steady-state or dynamic models as the problem requires

How we work

  1. Agree the physical formulation and assess input completeness.
  2. Build a bounded model and study selected scenarios.
  3. Compare with data and document applicability.

Deliverable

A mathematical model, calculation results, applicability assessment and technical conclusions in the agreed scope.

How we check the result

Check balances, convergence and reference problems; compare with available measurements and their uncertainty.

Scope and limitations. Thermal studies need fluid and heat-transfer properties; hydraulics needs flow-regime and boundary assumptions. Insufficient validation data is stated explicitly.

Getting started

Describe the process, problem and decision to be made. We clarify constraints and available data, identify a possible method and validation requirements, then propose a bounded first stage.

Request a preliminary engineering assessment

HAVE AN ENGINEERING CHALLENGE?

Start with a preliminary engineering assessment.

Describe the process, problem and decision to be made. We clarify constraints and available data, identify a possible method and validation requirements, then propose a bounded first stage.

Prepare your problem for assessment ↗